- Substructure: beam 200x50 mm
- Material: galvanized steel with Polyester polymer coating 0.5 mm, ArcelorMittal, Germany
- Water-proof foil: Metalroof 120, 120 g/m2, Eurovent, Poland
- Heat insulation: basalt wool TechnoNIKOL, 35 kg/m3, Russia
- Roofing type: standing seam roof
Description:
Overhaul of the roof of an office building with a complete replacement of the finish roofing. Our company has carried out works on the dismantling of the old roofing, partial replacement of insulation and wooden subconstructure, and complete replacement of the finishing roofing.